<< November 2017 >>
Sun Mon Tue Wed Thu Fri Sat
 01 02 03 04
05 06 07 08 09 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30


If you want to be updated on this weblog Enter your email here:



rss feed



Nov 4, 2013
Operational experience on the LM Vertical Grinding Mills

 

Because of the many advantages of LM Vertical Grinding Mills , has become the first choice of cement raw material grinding equipment . But in practice , there are still many problems worth noting here are some operational experience .

 Operating points 1.1 stable material bed       

Stable material bed , which is a roll of abrasive grinding bed base , the normal operation of the key . The thickness of the material layer can be adjusted to adjust the height gauge ring , suitable thickness as well as their production and the correspondence between the mill should first find out during the commissioning phase . Material layer is too thick grinding efficiency , material layer is too thin will cause vibration . If roll pressure increase, the resulting powder and more , the thinner the material layer ; roll reduction , disc thicker material , the material returns more appropriate , thickened material layer . Wind mill increase , increasing the inner loop , the material layer thickness, reducing the wind speed , reduce internal circulation , material layer thinning . In the normal operation of the lower roller mill by grinding roller compacted material bed thickness of not less than 40 ~ 50ram.

1.2 Control grinding pressure     

LM Vertical Grinding Mills output pressure is affected , the mill grinding efficiency and power of the main factors . LM Vertical Grinding Mills is by means of high pressure imposed on the material bed crushing pressure to increase production increases, but reaches a certain critical value does not change , the increase in pressure followed by a power increase , resulting in energy consumption per unit of increases, so the appropriate roll to yield and energy both. This value depends on the material properties , particle size and volume of feed . To find out when the trial production of a suitable grinding pressures and wind pressure can form a reasonable good internal circulation, so that the material on the disc layer proper , stable, high grinding efficiency . In the production process, when the wind ring size is fixed, the amount determined by the wind speed . Production of the corresponding relationship between the ability to ensure that the grinding results.

1.3 out of grinding to guarantee a certain temperature       

LM Vertical Grinding Mills is drying and grinding system , the temperature is a measure of the mill drying operation is normal comprehensive index . In order to ensure good drying of raw materials Well, the grinding of the material is less than 0.5% moisture content , the general control mill outlet temperature of about 90 ~ C . If the temperature is too low then the finished water , causing the powder grinding efficiency and lower efficiency dust collection system may cause condensation ; such as too high , which means that not enough gas cooling and humidification , dust collection will also affect results.

1.4 Control reasonable speed      

 LM Vertical Grinding Mills driven mainly by the material flow cycle . The wind can form a reasonable good internal circulation, so the material layer on the disc proper , stable, high grinding efficiency . But the amount is determined by wind speed decisions, and the volume of feed air volume is associated , such as feeding volume, air volume should be large ; otherwise reduced. Fan air flow impact resistance by the system can be adjusted by adjusting the fan valve . Drop mill , grinding into negative , the grinding of the negative pressure can reflect the size of the air volume . Pressure drop , large negative pressure indicates wind speed , air volume ; otherwise the corresponding wind speed is small. The stability of these parameters on the stability that the air volume , thus ensuring the stability of the bed .

1.5 Control of raw material fineness      

The fineness of the raw material by separation speed , air volume system , the mill load and other effects . In the wind and load the same circumstances , you can manually change the speed to adjust the fineness adjustment up to increase or decrease each 2r/min, vibration mill over the General Assembly to increase the lead to even tripping.


Posted at 12:57 pm by mgrinding
Make a comment